Skip to main content
PolicySpeak
← All files
BCA

Baltic Cable AB

Company · Sweden · EU Transparency Register 405062345725-15

2
positions filed
in the 326 files tracked
2
legislative files
of 326 tracked
2
with a full position paper
attached to a submission

Counts here are a floor, never a total: they cover the 326 consultation files tracked so far (29,503 submissions, mostly 2025–26), so an organization's real filing history is larger, not smaller.

Who they are

Among the 925 companies & groups on this site, they rank #369 by legislative files engaged — a count of participation, not a measure of influence.

0.8
declared lobbying FTE
self-declared
€100K+
declared costs / yr (floor)
0
EP accreditations
as declared to the register
2022
in the register since
Register category
Companies & groups
Head office
Malmö, Sweden

Self-declared to the EU Transparency Register (snapshot 30 Aug 2026); cost bands are floors, not audited totals. Reused under Commission Decision 2011/833/EU.

Track Baltic in PolicySpeak: request access →

Work at Baltic Cable AB? so we know who speaks for it.

Follow the files Baltic Cable AB engages with

One email on Tuesdays when a new position is filed on these 2 files, from Baltic Cable AB or from anyone else on them. Only when there is something new.

We use your email for these updates, and PolicySpeak may contact you about the product. Unsubscribe in one click. Privacy policy.

Their record over time

Baltic Cable AB filed 2 positions between 25 Jul 2025 and 9 Oct 2025, across 2 of the 326 legislative files tracked here, attaching a full position paper 2 times.

What they argued

Trans-European energy infrastructure: guidelinesfiled 25 Jul 2025PDFsource

The importance of recognising interconnectors, and interconnector TSOs, in European as well as in regional and national legislative and regulatory frameworks, is crucial for an accelerated interconnector development and the closure of the 32 GW interconnector gap until 2030 and onwards. Current legislations put focus on traditional frequency control area TSOs.

Electrification Action Planfiled 9 Oct 2025PDFsource

To meet the electrification challenges and to overcome the existing barriers that risks hampering the increase in electrification, cross-border interconnectors are crucial for the implementation of the Electrification Action Plan and the upcoming EU Grid Package.

Looking for an argument rather than an organization? Search every submission for a phrase and see everyone who used it.

Turns up on the same files

Organizations that also filed on at least two of the same consultations. A shared interest in the same dossiers — not evidence of coordination, and we do not suggest any.

Showing 5 of 47.

Is this your organization?

Everything on this page comes from Baltic Cable AB’s own submissions to the European Commission — we have added nothing and interpreted nothing. If something is wrong or out of date, email info@policyspeak.com and we will correct it. If you are an individual named in a record, our privacy policy sets out your rights to correction, objection and removal.

Quotes are verbatim from submissions published by the European Commission, trimmed to their opening passage and never summarized by a model. Organizations only, never individuals. Reused under Commission Decision 2011/833/EU; the European Commission is not liable for this reuse.