Summary of Recommendations (please refer to attached document for further details): Guiding Principles 1. Implement harmonised and legally binding permitting deadlines across the EU. 2. Ensure regulatory certainty to encourage anticipatory grid investment. 3. Improve affordability through better market integration and fair cost allocation. 4. Embed flexibility, digitalisation, and cross-sector integration (e.g.
Wind Energy Ireland
Industry association · Ireland
Counts here are a floor, never a total: they cover the 326 consultation files tracked so far (29,503 submissions, mostly 2025–26), so an organization's real filing history is larger, not smaller.
Track Wind in PolicySpeak: request access →
Work at Wind Energy Ireland? so we know who speaks for it.
Their record over time
Wind Energy Ireland filed 2 positions between 5 Aug 2025 and 25 Aug 2026, across 2 of the 326 legislative files tracked here, attaching a full position paper 2 times.
What they argued
WEI Response to the European Commission’s Revised Network code on requirements for grid connection of generators 25/08/2026 Statkraft Internal Contents Introduction ..........................................................................................................................................................
Opening of the attached position paper · the full paper is on the Commission’s record (source link above)
Looking for an argument rather than an organization? Search every submission for a phrase and see everyone who used it.
Turns up on the same files
Organizations that also filed on at least two of the same consultations. A shared interest in the same dossiers — not evidence of coordination, and we do not suggest any.
- Iberdrola S.A. · 2 files in common
- Enel SpA · 2 files in common
- Eurelectric · 2 files in common
- BDEW Bundesverband der Energie- und Wasserwirtschaft e. V. · 2 files in common
- ENTSO-E (European Network of Transmission System Operators for Electricity) · 2 files in common
Showing 5 of 17.
Is this your organization?
Everything on this page comes from Wind Energy Ireland’s own submissions to the European Commission — we have added nothing and interpreted nothing. If something is wrong or out of date, email info@policyspeak.com and we will correct it. If you are an individual named in a record, our privacy policy sets out your rights to correction, objection and removal.
Quotes are verbatim from submissions published by the European Commission, trimmed to their opening passage and never summarized by a model. Organizations only, never individuals. Reused under Commission Decision 2011/833/EU; the European Commission is not liable for this reuse.