Skip to main content
PolicySpeak
← All files
NLL

Nemo Link Limited

Company · United Kingdom

not in the EU Transparency RegisterThis organization files on consultations without a register number, so its record here is built from its filings alone. Register facts (staff, costs, accreditations) are not available for it.

4
positions filed
in the 665 files tracked
3
legislative files
of 665 tracked
4
with a full position paper
attached to a submission

Counts here are a floor, never a total: they cover the 665 consultation files tracked so far (57,774 submissions, mostly 2021–26), so an organization's real filing history is larger, not smaller.

Track Nemo in PolicySpeak: request access →

Follow Nemo Link Limited

An email when this organization files on a consultation we publish.

We use your email for these updates, and PolicySpeak may contact you about the product. Unsubscribe in one click. Privacy policy.

Work at Nemo Link Limited? so we know who speaks for it.

Their record over time

Nemo Link Limited filed 4 positions between 26 Aug 2025 and 10 Jun 2026, across 3 of the 665 legislative files tracked here, attaching a full position paper 4 times.

2025 · 3 filed2026 · 1 filed

What they argued

Carbon Border Adjustment Mechanism: extension of its scope to downstream goods and anti-circumvention measuresfiled 26 Aug 2025PDFsource

Nemo Link welcomes the opportunity to provide its views to the EC consultation on the Carbon Border Adjustment Mechanism (CBAM) downstream extension, anti-circumvention and rules on electricity emissions. The current EU CBAM legislation will lead to many unintended and negative consequences for electricity trade, notably for trading electricity between the EU and the UK.

Objection pursuant to Rule 115(2) and (3) of the Rules of Procedure on the draft Commission Implementing Regulation laying down rules for the application of Regulation (EU) 2023/956 of the European Parliament and the Council as regards the methods for the calculation of emissions embedded in goodsfiled 25 Sept 2025PDFsource

Nemo Link Limited operates the 1000MW HVDC electricity interconnector between GB and Belgium. Please find attached the joint response from Nemo Link and other EU and GB Transmission System Operators including RTE, Elia, Energinet, National Grid Interconnectors, BritNed, ElecLink, GreenLink.

Looking for an argument rather than an organization? Search every submission for a phrase and see everyone who used it.

Put Nemo Link Limited next to another organization. Same files, same register facts, side by side. Compare →

Turns up on the same files

Organizations that also filed on at least two of the same consultations. A shared interest in the same dossiers, not evidence of coordination, and we do not suggest any.

Showing 5 of 112.

Is this your organization?

Everything on this page comes from Nemo Link Limited’s own submissions to the European Commission. We have added nothing and interpreted nothing. If something is wrong or out of date, email info@policyspeak.com and we will correct it. If you are an individual named in a record, our privacy policy sets out your rights to correction, objection and removal.

Quotes are verbatim from submissions published by the European Commission, trimmed to their opening passage and never summarized by a model. Organizations only, never individuals. Reused under Commission Decision 2011/833/EU; the European Commission is not liable for this reuse.