Skip to main content
PolicySpeak
← All files
EEN

ENTSO-E (European Network of Transmission System Operators for Electricity)

Industry association · Belgium · EU Transparency Register 25805148045-87

14
positions filed
in the 326 files tracked
14
legislative files
of 326 tracked
13
with a full position paper
attached to a submission

Counts here are a floor, never a total: they cover the 326 consultation files tracked so far (29,503 submissions, mostly 2025–26), so an organization's real filing history is larger, not smaller.

Who they are

Among the 1205 trade and business associations on this site, they rank #70 by legislative files engaged — a count of participation, not a measure of influence.

4
declared lobbying FTE
self-declared
€800K+
declared costs / yr (floor)
4
EP accreditations
as declared to the register
2012
in the register since

Declares membership of

  • CIGRE

Self-declared to the EU Transparency Register (snapshot 30 Aug 2026).

Register category
Trade and business associations
Registered as
European Network of Transmission System Operators for Electricity (ENTSO-E)
Head office
Brussels, Belgium

Self-declared to the EU Transparency Register (snapshot 30 Aug 2026); cost bands are floors, not audited totals. Reused under Commission Decision 2011/833/EU.

Track ENTSO-E in PolicySpeak: request access →

Work at ENTSO-E (European Network of Transmission System Operators for Electricity)? so we know who speaks for it.

Follow the files ENTSO-E (European Network of Transmission System Operators for Electricity) engages with

One email on Tuesdays when a new position is filed on these 14 files, from ENTSO-E (European Network of Transmission System Operators for Electricity) or from anyone else on them. Only when there is something new.

We use your email for these updates, and PolicySpeak may contact you about the product. Unsubscribe in one click. Privacy policy.

Their record over time

ENTSO-E (European Network of Transmission System Operators for Electricity) filed 14 positions between 7 Mar 2025 and 25 Aug 2026, across 14 of the 326 legislative files tracked here, attaching a full position paper 13 times.

2025 · 7 filed2026 · 7 filed

What they argued

Acceleration of industrial capacity and decarbonisation in strategic sectors (Industrial Accelerator Act)filed 18 Jun 2026PDFsource

ENTSO-E, the European Network of Transmission System Operators for Electricity, brings together 40 member TSOs from 36 countries to ensure the secure and coordinated operation of Europes electricity system one of the worlds largest interconnected grids. Created with a legal mandate under EU law, ENTSO-E delivers technical coordination and strategic contributions to support Europes energy and climate objectives.

Evaluation of the Public Procurement Directivesfiled 7 Mar 2025PDFsource

ENTSO-E, the European Network of Transmission System Operators for Electricity, is the association for the cooperation of the European transmission system operators (TSOs). The 40 member TSOs representing 36 countries are responsible for the secure and coordinated operation of Europe's electricity system, the largest interconnected electrical grid in the world.

Revision of EU rules on public procurementfiled 26 Jan 2026PDFsource

ENTSO-E, the European Network of Transmission System Operators for Electricity, brings together 40 member TSOs from 36 countries to ensure the secure and coordinated operation of Europes electricity system one of the worlds largest interconnected grids. Created with a legal mandate under EU law, ENTSO-E delivers technical coordination and strategic contributions to support Europes energy and climate objectives.

Simplification of some requirements and reduction of administrative burden in the areas of batteries and industrial emissions reporting (Omnibus VIII on environmental legislation)filed 7 May 2026PDFsource

Overall, ENTSO-E welcomes the Environmental Omnibus Package as an enabler for faster grid deployment while preserving the integrity of EU environmental law. The attached position provides ENTSO-E's detailed feedback on Omnibus Package, especially on the following aspects : 1/ HARMONISATION AND LEGAL CONSISTENCY - Need for harmonisation wording and concepts across all EU permitting and energy legislation to avoid…

Trans-European energy infrastructure: guidelinesfiled 5 Aug 2025PDFsource

The grid is the backbone of the European interconnected electricity network. It stretches across and beyond the EU from Portugal to Ukraine and the Balkans from Norway to Italy. Transmission System Operators (TSOs) operate the electricity system efficiently, securely and in coordination, ensuring that electricity flows reliably across borders.

Safety, resilience and sustainability of space activities in the Unionfiled 21 Oct 2025PDFsource

ENTSO-E, representing the European Transmission System Operators (TSOs) for electricity, welcomes the objectives of the EU Space Act, in particular its ambition to ensure the resilience of critical infrastructures, recognising its strategic importance for the energy sector.

Update of the governance of the Energy Union and climate actionfiled 6 Mar 2026PDFsource

ENTSO-E welcomes the European Commissions initiative to revise Regulation 2018/1999 on the Governance of the Energy Union and Climate Action. The evaluation published in October 2024 shows that the existing framework has been effective but must now evolve to reflect a rapidly changing geopolitical, technological, and climate environment.

Revision of the EU’s energy security frameworkfiled 13 Oct 2025source

ENTSO-E echoes the preliminary findings from the Energy Security Architecture Fitness Check. Specifically, we consider the EU energy security framework to be too fragmented across sectors to efficiently counter emerging threats. Option 1 Smart streamlining is necessary to tackle the gaps in the current security framework.

EU Critical Raw Materials Centrefiled 29 Jul 2026PDFsource

ENTSO-E is the European Network of Transmission System Operators for Electricity, representing 40 TSOs across 36 European countries responsible for the secure and coordinated operation of Europe's electricity system - the largest interconnected electrical grid in the world. ENTSO-E welcomes the opportunity to contribute to this Call for Evidence. Please find our contribution attached.

Revision of the REMIT Implementing Regulation on data reportingfiled 13 Sept 2025PDFsource

Firstly, we thank the European Commission for the opportunity to provide feedback. In this note, TSOs provide constructive feedback to improve the REMIT Implementing Regulation (IR). Our detailed proposals are set out in the Attachment. We respectfully urge the Commission to review these points in detail and ensure the final REMIT IR is both effective and workable.

Minimum requirements on environmental sustainability for NZIA public procurement proceduresfiled 14 Oct 2025PDFsource

ENTSO-E, the European Network of Transmission System Operators for Electricity, is the association for the cooperation of the European transmission system operators (TSOs). The 40 member TSOs representing 36 countries are responsible for the secure and coordinated operation of Europe's electricity system, the largest interconnected electrical grid in the world.

Looking for an argument rather than an organization? Search every submission for a phrase and see everyone who used it.

Turns up on the same files

Organizations that also filed on at least two of the same consultations. A shared interest in the same dossiers — not evidence of coordination, and we do not suggest any.

Showing 5 of 490.

Is this your organization?

Everything on this page comes from ENTSO-E (European Network of Transmission System Operators for Electricity)’s own submissions to the European Commission — we have added nothing and interpreted nothing. If something is wrong or out of date, email info@policyspeak.com and we will correct it. If you are an individual named in a record, our privacy policy sets out your rights to correction, objection and removal.

Quotes are verbatim from submissions published by the European Commission, trimmed to their opening passage and never summarized by a model. Organizations only, never individuals. Reused under Commission Decision 2011/833/EU; the European Commission is not liable for this reuse.