Skip to main content
PolicySpeak
← All files
ESG

Enagás GTS

Company · Spain

4
positions filed
in the 326 files tracked
4
legislative files
of 326 tracked
4
with a full position paper
attached to a submission

Counts here are a floor, never a total: they cover the 326 consultation files tracked so far (29,503 submissions, mostly 2025–26), so an organization's real filing history is larger, not smaller.

Track Enagás in PolicySpeak: request access →

Work at Enagás GTS? so we know who speaks for it.

Follow the files Enagás GTS engages with

One email on Tuesdays when a new position is filed on these 4 files, from Enagás GTS or from anyone else on them. Only when there is something new.

We use your email for these updates, and PolicySpeak may contact you about the product. Unsubscribe in one click. Privacy policy.

Their record over time

Enagás GTS filed 4 positions between 7 Nov 2024 and 10 Apr 2026, across 4 of the 326 legislative files tracked here, attaching a full position paper 4 times.

2024 · 1 filed2025 · 1 filed2026 · 2 filed

What they argued

Renewable energy legal framework post-2030filed 10 Apr 2026PDFsource

As the European energy transition moves beyond 2030, the main challenge is no longer the deployment of renewable generation capacity, but its effective integration into the energy system. Higher renewable electricity shares expose daily, seasonal and structural mismatches between supply and demand that cannot be addressed through shortterm flexibility solutions alone.

Revision of the EU’s energy security frameworkfiled 13 Oct 2025PDFsource

Enagás GTS is the body responsible for ensuring the security of supply in the Spanish gas system, which involves guaranteeing its proper planning and operation. In carrying out its functions as Technical System Operator, Enagás GTS safeguards the continuous balance between supply and demand, coordinates the operation of gas infrastructures, and prepares preventive and emergency plans.

COMMISSION DELEGATED REGULATION on extending the scope of traceability of the Union databasefiled 7 Nov 2024PDFsource

Please find attached our recommendations in the document attached, that can be summarized as: Extend the transaction timeline beyond three working days to accommodate the complexities of data reporting. Define the triggering point for gas injection in alignment with regulated gas market processes, particularly those related to the balancing network point.

Looking for an argument rather than an organization? Search every submission for a phrase and see everyone who used it.

Turns up on the same files

Organizations that also filed on at least two of the same consultations. A shared interest in the same dossiers — not evidence of coordination, and we do not suggest any.

Showing 5 of 89.

Is this your organization?

Everything on this page comes from Enagás GTS’s own submissions to the European Commission — we have added nothing and interpreted nothing. If something is wrong or out of date, email info@policyspeak.com and we will correct it. If you are an individual named in a record, our privacy policy sets out your rights to correction, objection and removal.

Quotes are verbatim from submissions published by the European Commission, trimmed to their opening passage and never summarized by a model. Organizations only, never individuals. Reused under Commission Decision 2011/833/EU; the European Commission is not liable for this reuse.